![]() ![]() Strike date.įlying Fish was decommissioned on and stricken from the Naval Vessel Register the same day. - Decommissioned at Puget Sound NSY, She had nine commanding Officers and steamed 600.000 miles.- Placed "in reserve, in commission" from the active fleet for decommissioning.May 1995 Mine laying exercises, Joint Service Special Warfare operations - Operational Test Launch of Tomahawk cruise missile. Roosevelt Roads, Curaçao and Bridgeport, Barbados Atlantic cruise, visited Toulon, La Maddalena, Gibraltar. - Returned to Norfolk from 4-month med and S.- CDR Louis T Roumaya relieved CDR Stanley J Mack as CO at Naval station Norfolk.- Rejoined Subron 6 at Norfolk Naval Base after 2 1/2 years extended overhaul at PSNSY.- Completed overhaul at Puget sound NSY.- Arrived New London for Refresher training.-Returned to Norfolk after 5 months med deployment, visiting La Spezia, Italy and Ashdod, Israel.10/1981 - 12/1981 Deployed to northern Atlantic for "Spec Op," awarded Navy Expeditionary Medal, Meritorious Unit Commendation.- USS Flying Fish provided for Atlantic Ocean security for first Space Shuttle launch.- Returned to Norfolk after 5 months med deployment, visiting ports including Athens, Greece, Naples, Italy, La Spezia, Italy, and Ashdod, Israel.Meinecke as CO, 7/1980 - Deployed to Mediterranean. 4/1980 USS Flying Fish awarded Battle Efficiency "E," for operations excellence.10/79-12/79 - Deployed to northern Atlantic for "Spec Op," awarded Navy Expeditionary Medal.4/1979 -6/79 - Completed torpedo range certification, Bahamas and visit Rosey Roads, Puerto Rico.Once sea trials completed joined Subron 6 stationed at D&S Piers in Norfolk, VA. 12/1978 completed overhaul and deployed for sea trials.Entered Portsmouth Naval Shipyard for overhaul, late 1977. - Returned to Norfolk from polar cruise.She was 11th to visit and 10th to surface at the pole. - Surfaced at North pole at midnight and remained there for 12 hours.This section needs expansion with: history for 1976-1996. Harvey, widow of the last commanding officer of USS THRESHER, and commissioned on 29 April 1970. The contract to build Flying Fish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 30 June 1967. ![]() USS Flying Fish (SSN-673), a Sturgeon-class attack submarine, was the third ship of the United States Navy to be named for the flying fish, any of number of fishes whose long winglike fins make it possible for them to move some distance through the air. One S5W nuclear reactor, two steam turbines, one screw Scrapping via Ship and Submarine Recycling Program completed 15 October 1996 Marjorie Sterrett Battleship Fund Award for U.S. 1972–1973.Įlectric Boat Division of General Dynamics Corporation at Groton, Connecticut USS Flying Fish (SSN-673) off Norfolk, Virginia, ca.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |